Dry-Dock Planning

Reduce dry dock cost overruns and schedule deviations with disciplined project control, EVM tracking, and a dedicated Dry Dock Superintendent.

Dry dock supervision with EVM control, dedicated superintendent, and full financial close. Reduce cost overruns and schedule deviations. Request supervision.

ATL · DD

Mission Dashboard

// PHASE-01

Assess Fleet Risk

We prioritize technical criticality, operational risk and intervention windows by vessel type.

// PHASE-02

Plan & Control

We define a technical-economic baseline with variance tracking and documented evidence.

// PHASE-03

Execute & Verify

We execute with end-to-end traceability and an audit-ready close-out package.

Availability Control92%
Compliance Evidence96%
On-time Delivery89%

DD · TRIGGER

When to Engage

Scheduled statutory dry dock, emergency dry dock, or major corrective works requiring dry berth. Also trigger when you need independent supervision of yard performance.

DD · SCOPE

Scope of Work

  • Pre-docking survey and work list validation
  • Dry Dock Superintendent assigned for the full duration
  • Budget baseline, contingency plan, and EVM tracking (CV/SV)
  • Coordination with class surveyors, flag, and third-party vendors
  • Change control and risk register maintained throughout

DD · STANDARDS

Applicable Standards

  • IACS UR Z10.2 (dry docking procedures)
  • IMO ISM Code Section 10
  • SOLAS Regulation II-1/3-1
  • Flag and Port State requirements

Deliverables (Evidence Package)

  • DELStructured scope of work validated pre-docking
  • DELDry dock schedule (Gantt) with critical path
  • DELPhysical-financial tracking with CV/SV variance analysis
  • DELIncident, change, and risk log maintained throughout
  • DELFinal dry dock report with financial close

DD · FAQ

Frequently Asked Questions

How do you control budget variance during dry dock?

We establish a budget baseline and contingency before docking, track earned value (CV/SV) weekly, and maintain a change log for every scope deviation. The final report includes financial close with variance analysis.

Can you supervise at any shipyard worldwide?

Yes. Our superintendents mobilise to any yard. We handle vendor coordination, class liaison, and reporting regardless of location.

What documentation do I receive after dry dock?

A complete closure package: structured work list, final schedule (Gantt), physical-financial tracking, incident and risk logs, and the final dry dock report with class documentation.