// PHASE-01
Assess Fleet Risk
We prioritize technical criticality, operational risk and intervention windows by vessel type.
Reduce dry dock cost overruns and schedule deviations with disciplined project control, EVM tracking, and a dedicated Dry Dock Superintendent.
Dry dock supervision with EVM control, dedicated superintendent, and full financial close. Reduce cost overruns and schedule deviations. Request supervision.
ATL · DD
Mission Dashboard
// PHASE-01
Assess Fleet Risk
We prioritize technical criticality, operational risk and intervention windows by vessel type.
// PHASE-02
Plan & Control
We define a technical-economic baseline with variance tracking and documented evidence.
// PHASE-03
Execute & Verify
We execute with end-to-end traceability and an audit-ready close-out package.
DD · TRIGGER
When to Engage
Scheduled statutory dry dock, emergency dry dock, or major corrective works requiring dry berth. Also trigger when you need independent supervision of yard performance.
DD · SCOPE
Scope of Work
DD · STANDARDS
Applicable Standards
DD · FAQ
Frequently Asked Questions
We establish a budget baseline and contingency before docking, track earned value (CV/SV) weekly, and maintain a change log for every scope deviation. The final report includes financial close with variance analysis.
Yes. Our superintendents mobilise to any yard. We handle vendor coordination, class liaison, and reporting regardless of location.
A complete closure package: structured work list, final schedule (Gantt), physical-financial tracking, incident and risk logs, and the final dry dock report with class documentation.
Submit a service request and our team will respond within your urgency SLA window.
Request Service